Handover issues are rarely dramatic. They are small gaps in scope detail, sequencing, or ownership that compound downstream.
The result is predictable: missed assumptions, rework, and frustrated teams.
A short, repeatable checklist creates clarity without slowing delivery.
- Scope summary and exclusions
- Material and access constraints
- Site sequencing and dependencies
- Owner for each unresolved decision
Add two confirmation moments: one internal (PM to crew) and one external (client-facing).
These checkpoints dramatically reduce avoidable ambiguity and protect delivery quality.